At this time there are 297 service connections existing in the District. There are no vacant lots left in the District although subdivision of an existing lot is still a possibility. The cost of a new sevice connection is $1,225.00 plus time and materials required for installation of that connection. If you need to discuss creating a new connection contact the District Manager at 760-920-1472 or the CPAs office at 760-873-3508.